Archive

UDK: UDK 69.008.001.8:624.032.22

Published: Građevinar 65 (2013) 11
Paper type: Subject review
Download article (Croatian): PDF
Download article (English): PDF
View count: 241

Work cycle based scheduling

Zoran Stojadinović, Nenad Ivanišević, Dejan Marinković

Abstract

The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a case study of constructing seven multi-storey structures. It was concluded that WCBS helps overcome restrictions of existing approaches to micro scheduling (daily tasks and crew coordination), enhances the scheduling process and increases productivity of works.

Keywords
productivity, short-term schedules, workflow, work cycle

HOW TO CITE THIS ARTICLE:

Stojadinović, Z., Ivanišević, N., Marinković, D.: Work cycle based scheduling, GRAĐEVINAR, 65 (2013) 11, pp. 993-1002, doi: https://doi.org/10.14256/JCE.845.2013

OR:

Stojadinović, Z., Ivanišević, N., Marinković, D. (2013). Work cycle based scheduling, GRAĐEVINAR, 65 (11), 993-1002, doi: https://doi.org/10.14256/JCE.845.2013

LICENCE:

Creative Commons License
This paper is licensed under a Creative Commons Attribution 4.0 International License.
Authors:
Zoran Stojadinovic fotografija
Zoran Stojadinović
University of Belgrad
Faculty of Civil Engineering
Ivanisevic Nenad WEB
Nenad Ivanišević
University of Belgrade
Faculty of Civil Engineering
Dejan Marinkovic fotografija
Dejan Marinković
University of Belgrad
Faculty of Civil Engineering