Published: Građevinar 61 (2009) 9
Paper type: Professional paper
Download article (Croatian): PDF
Download article (English): n/a
Rječina bridge on the southern pavement of the Rijeka Bypass
Abstract
A new bridge is currently under construction on the south pavement of the Rijeka Bypass, next to the existing bridge built in 1984. The design documentation for both bridges was prepared already in 1970s, but the construction of the southern pavement was postponed. In the new design, the initial design requirements have been adjusted to the modern requirements regarding load-bearing capacity in operation. The increased traffic and seismic actions call for an increase in the size of cross sections, which in turn results in greater consumption of materials when compared to the initial design.
Keywordsincrease in size, Rječina bridge, southern pavement, new design, traffic action, seismic action, Rijeka Bypass